PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing split wire above the cealing at the 3rd Floor Facing North (800x600).jpg Installing top track at the 2nd Floor Facing North-East (800x600).jpg Plumbing material for the 3rd floor bathrooms Facing East (800x600).jpg Poured concrete at the 2nd half of the 4th Floor Facing East (800x600).jpg Welding clips at the North Elevation (2nd Floor)(800x600).jpg Started fireproofing the 2nd Floor Facing West (800x600).jpg Welding beam clips at the 2nd Floor East Elevation (800x600).jpg
Previous pageNext page Welding clips at the North Elevation (2nd Floor)(800x600)
Welding clips at the North Elevation (2nd Floor)(800x600)